Description
1/1250 LNG Tanker (Liquefied Natural Gas GOLAR FREEZE, Paper Model
1 model
7 pages of parts
18 pages of illustrated assembly instructions
196 parts
Degree of Difficulty: 3/5
The fourth picture shows the GOLAR FREEZE lying at an oil terminal. The oil terminal is not included in the kit.
Reviews
There are no reviews yet.